CONSTRUCTION

electrical-box-installed-031010

Today marks the advent of a new phase! Formerly we’ve only known destruction, but today something was actually constructed. Because there are two homes on the property, there are two separate meters for electricity. Both homes were wired for 100amp, but today they were changed to 200amp. We also changed where the electrical boxes were located to hide them along the side of the guest house which cleans up their former location. My friend Jesus did an awesome job.

jesus-on-the-roof-031010

This entry was posted in home restoration. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *