hallway is mostly done

The hallway to the bedrooms was awful. There were multiple door bells, multiple fire alarms, some mystery box, a sconce light, and an old dated thermostat. I had the walls and ceiling re-textured and painted. The baseboard was finished. And a new smart thermostat added which is a really nice update. We changed the sconce light (a terrible idea for a narrow hallway) for 3 recessed LED lights.

Next month I hope to replace the trim around each of the doors (there are 6 off the hallway) along with updating each of the doors, along with the hinges and hardware.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *