When we got the house inspected initially, there was one place that had termites which was this beam. It was in rough shape, so today I had it replaced.
Cutting it out was the easy part. The existing beam did not have a proper footer which caused it to rot out. So I found a solid metal option.
This should help to reduce water damage. I plan to replace the facia on two of the patios this week and then will install gutters.
Had some slow but major success with the pool light. When I painted the pool a few weeks back I replaced the burnt out bulb that was there, with an LED multi color upgrade. The problem was the circuit had been previously cut, so I had to reconnect. No small task.
I installed a switch connected to wifi so I can put on timer and connect from anywhere.
Some good progress today.