more weekend work

The weekends have become more laborious than the work week. It’s nice we’re getting caught up on some work at home. But it rules out the opportunity for any rest.

We redid the pool deck. This included drilling out the cracks and filling them. This took an extraordinary amount of time. But now we have completed the pool deck and the pool which saved us over $20k in estimated labor.

Then we changed the pool light. Later we found the control box for the new pool light was defective. That’s fun. So I ordered a new one which should arrive tomorrow. And then perhaps we can install the new control box and send the defective one back.

We then did oil changes on all three vehicles. Our fourth vehicle is up in Phoenix hoping to be sold soon. We had someone fly in from Utah this last weekend, but they decided to go with a different vehicle. We are selling it for $4000 more than we bought it 5 years ago. We could lower the price to sell it faster, but we are in no hurry.

On Saturday I picked up a half ton of mortar sand. We will need that while we raise our wall. I still need to pick up eleven bags of mortar cement which will weigh nearly a thousand pounds.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *